Client
University of Pennsylvania
Project
College Hall West Wing
Project Type

Following a major renovation on its east and central wings between 1990 and 2000, Penn initiated a comprehensive restoration of the west wing in 2023 to restore College Hall's stature, physical presence, and impact as the first building on its campus.

When work is completed in early 2025, the $87.4 million restoration will have achieved new, historically appropriate and energy efficient systems and infrastructure, repair of roof and windows, masonry walls, and stone cladding, renovation and upgrades to interior suites, offices, and classrooms, and more accessibility options, including new and updated elevators.

As the consulting architect for the building envelope on Atkin Olshin Schade Architects' project team, KMA is responsible for the repair and replacement of the exterior cladding, masonry, and wood windows, as well as coordinating the survey and documentation for the replacement of the roofing systems. Specifically, our scope of work entails:

EAST AND WEST WINGS

  • Wood Windows:  We surveyed the condition of the existing wood window frames and sash and then documented their repair or replacement and the replacement of window sashes with new insulated glazed units.  
  • Roof Systems:  In association with engineering consultant RWDI, we surveyed the roof systems and documented their replacement with coated metal roofing for sloped and flat areas, and new slate roofing on the mansard roofs, based on waterproofing design and technical details supplied by RWDI.

WEST WING ONLY

  • Serpentine Cladding:  Our documentation of the removal of the serpentine stone cladding and its replacement with new cast stone replications was coordinated with the structural engineer, Keast & Hood, who was responsible for designing and detailing the structural details for securing the stone cladding to the back-up rubble wall.

EAST WING ONLY

  • Exterior Masonry Repairs:  After assisting Keast & Hood with a conditions survey of masonry in isolated locations, we documented its repair or replacement based on their recommendations.  

Watch an exciting in-progress construction video by Clemens Construction Company HERE.  

upenn collegehall 1 2 1440x1080x72
Image from Penn's archives. When it was first constructed in 1873, the building housed almost all of the college functions, including the library, classrooms, laboratories and offices. In recent years, it has been the home of the the university's president, provost, School of Arts and Sciences’ Department of History, and the Undergraduate Admissions Office. Its significance in the history of collegiate architecture has been recognized by U.S. Department of Interior by placing it on the National Registry of Historic Places and in the University of Pennsylvania National Historic District.
upenn collegehall 2 1440x1080x72
Drone image. The exterior of College Hall is a conventional 1870s combination of elements of both Second Empire and Gothic styles. The treatment of fenestration with Gothic motifs and the buttresses that punctuate the building's corners are more of a decorative veneer. The three pavilions mark the functional subdivisions of the arts, the sciences, and in the center, the administration. Large windows denote the major public spaces.
upenn collegehall 3 1440x1080x72
College Hall is memorable for its striking architectural polychromy created by the use of several stones in both structure and veneer, including brown and yellow sandstone, mica schist, serpentine, and granite.
upenn collegehall 5 1440x1080x72
Stabilizing and reconstituting the exterior masonry walls entailed removing the serpentine veneer, consolidating the interior and exterior surfaces of the back-up rubble wall, and replacing the veneer with cast stone replications. In preparation, KMA performed a 3D building scan of west wing elevations to identify and document the various stone shapes that would be replicated. Photo courtesy of Clemens Construction
upenn collegehall 6 1440x1080x72
A model of the exterior wall was constructed to test and validate the application of replicated stone against the rubble wall. Photo courtesy of Clemens Construction